The pocket watch was made accurate with a bi-metallic spring, two different metals borne together. The temperature changes were nominalized because of their different expansion rates. Ergo, I say, two days flat. We are all guided by the same laws.
Worker “B” does not work any more slowly than he did before, so the job should be done in better than 3 days because he has help from worker “A”. I don’t do math, but I know that I can generally get a job done faster if I have a helper. Even a less competent one.
Point is he is right, there is no mathmatical formulae for this. The real answer is that the shed will never be built because both would want to be in charge, they argue, fight, and storm off with nothing being done. BTDT.
HabaneroBuck over 13 years ago
X(0.2) + X(0.33)=1Solve for XX=1.89 days.
AB9SS over 13 years ago
The correct algebraic formula: AxB over A+B therefore:
5×3 over 5+3 = 15/8 = 1 7/8 = 1.875 days[Thank you to the movie: “Little Big League”];)
akjoeks Premium Member over 13 years ago
The pocket watch was made accurate with a bi-metallic spring, two different metals borne together. The temperature changes were nominalized because of their different expansion rates. Ergo, I say, two days flat. We are all guided by the same laws.
Habogee over 13 years ago
Worker “B” does not work any more slowly than he did before, so the job should be done in better than 3 days because he has help from worker “A”. I don’t do math, but I know that I can generally get a job done faster if I have a helper. Even a less competent one.
BillWa over 13 years ago
Point is he is right, there is no mathmatical formulae for this. The real answer is that the shed will never be built because both would want to be in charge, they argue, fight, and storm off with nothing being done. BTDT.