Coming Soon 👀 At the beginning of April, you’ll be
introduced to a brand-new GoComics! See more information here. Subscribers, check your
email for more details.
A word from the other side – a plumber told me it took him way longer to finish a project because the architect, kitchen designer, interior designer, and then the owner would come in and insist on changes.
Zykoic almost 5 years ago
Always add 30% to schedule and budget. Give wife controlling vote on all modifications.
jbrobo Premium Member almost 5 years ago
And she always has control of the colors.
A# 466 almost 5 years ago
Contractor’s axiom: The first 90% of the job takes 90% of the time; the last 10% of the job takes 90% of the time.
Andrew Sleeth almost 5 years ago
I’d be wary of any construction company that issues soup bowls for hard hats.
Ukko wilko almost 5 years ago
Cheap company – uses soup bowels for hard hats.
Michael G. almost 5 years ago
Close enough for government work?
Bill The Nuke almost 5 years ago
Bonuses for finishing early don’t work as well as penalties for finishing late.
COL Crash almost 5 years ago
No construction project is ever completed as soon as they told you it would and for anything close to the original cost estimate.
oldlady07 Premium Member almost 5 years ago
A word from the other side – a plumber told me it took him way longer to finish a project because the architect, kitchen designer, interior designer, and then the owner would come in and insist on changes.
WCraft almost 5 years ago
Hey, wasn’t that guy formerly the construction crew chief on an Illinois road repair crew?